How to Install Drip Edge on Roof Edges
Learn how to install drip edge on roof edges: eave and rake order, laps, fasteners, and what to confirm before a Texas reroof.

Knowing how to install drip edge on roof edges is a sequence question, not a shopping question. The metal has to go on in the right order at the eaves and the rakes. If it does not, water runs back onto the fascia and the deck instead of dropping clear of the building. One Real Roofer and Construction installs asphalt shingles, metal, TPO, and modified bitumen. That work covers residential and commercial roofs across Texas. On a new build or a reroof, the edge metal is part of that assembly. It is not a trim piece added at the end.
Call (817) 677-6822 to schedule a free roof inspection
What drip edge does at the roof edge
Drip edge is a formed metal strip fastened along the eaves and the rakes. The lower leg kicks out past the fascia so water leaves the roof in drips instead of clinging to the wood and running back toward the wall. The upper leg lies flat on the deck so the underlayment and the roof covering can lap over it and cover the fasteners.
Without that kick-out, water follows the underside of the shingle or the membrane and wets the fascia, the soffit, and the top edge of the sheathing. The stain often shows up inside long after the edge has been wet. A ceiling mark does not tell you the metal failed. It only tells you water got past the edge at some point.
Drip edge is not the same part as the flashing at a wall, a chimney, or a valley. Those pieces close joints where two surfaces meet. Drip edge only manages the perimeter. If you want the wider picture of those other joints, our guide to roof flashing covers where those problems start. When the edge is one piece of a larger commercial roof, start that scope conversation with roof system planning. This page stays on the perimeter metal.
On a shingle roof the piece is usually a painted or galvanized steel profile with a hemmed outer edge. On a low-slope commercial roof the same job is often done by a gravel stop, an edge metal, or a fascia-mounted drip that the membrane welds or bonds to. The name changes with the system. The job does not: get water off the roof and away from the wood.
Where drip edge goes on eaves and rakes
Two edges matter on a typical sloped roof, and they are not installed the same way. Getting the order backward at either one is enough to wet the fascia.
The eave is the lower horizontal edge, and it is usually the edge that carries the gutter. Water is supposed to leave the roof along this line. The drip edge goes on the bare deck first, before any underlayment. The underlayment then laps over the metal, so water on top of the felt or synthetic sheet sheds onto the metal and then into the gutter. If the underlayment goes down first and the metal sits on top of it, water can run under the metal and behind the fascia.
The rake is the sloped edge that runs along the gable, from the eave up toward the ridge. Wind can drive rain sideways along this edge, so the installation order flips. The underlayment goes on the deck first, and the drip edge is fastened on top of that sheet. Wind-driven water that gets under the shingle edge then lands on the underlayment instead of on bare wood. Putting the rake metal under the underlayment leaves an open path for that water to reach the deck.
The 2018 International Residential Code section R905.2.8.5 requires drip edge at the eaves and the rakes of shingle roofs. The metal has to extend at least a quarter inch below the roof sheathing and at least 2 inches back up the deck. Neighboring pieces overlap at least 2 inches. Fasteners are spaced no more than 12 inches apart. The underlayment goes over the drip edge at the eaves and under it at the rakes. The City of Augusta building office restates those same limits in its 2025 drip edge memo, and it fails a roofing inspection when the metal is missing. Local amendments can still be stricter than that published floor.
Texas cities and counties adopt the IRC with their own amendments. A statewide blog cannot tell you which edition your permit uses. On a permitted reroof or a new build, the plans and the local code decide the profile, the fastener, and whether an ice barrier is also required at the eave. North Texas does see ice at eaves in hard freezes. An ice barrier, where the code or the spec calls for it, is a separate sheet from the drip edge. It does not replace the metal.
How to install drip edge on a roof, in order
This is the sequence used on an asphalt shingle roof when the deck is ready for dry-in. It is the order to look for in a scope, not a weekend project plan. Edge work happens at height, on a deck that may be slick, and next to electrical service. One Real manages the construction after the scope is set. We do not treat this as owner-installed work.
- Confirm the deck edge is sound. Soft plywood, a rotten fascia, or a gutter hung on failed wood has to be repaired before any metal goes on. New metal fastened to bad wood will not hold.
- Start at the eaves. Set the metal tight to the deck with the kick-out pointing down and away from the fascia, past the sheathing by at least a quarter inch. The flat leg should reach at least 2 inches up the deck.
- Fasten the flat leg with roofing nails long enough to hold in the deck, spaced no more than 12 inches apart. Keep the nails high enough that the underlayment and the starter course will cover them. Do not nail through the face that will sit in the weather.
- Lap each new piece over the one before it by at least 2 inches, in the direction that sheds water downhill. A lap that faces uphill is a scoop.
- At the corner where the eave meets the rake, cut and fold the metal so the two runs join without a gap at the fascia. A square notch in the flat leg lets the piece bend a clean 90 degrees. Sealant at that corner is a backup, not a substitute for the lap.
- Install the underlayment over the eave metal, lapping onto the flat leg. Carry the underlayment up the roof per the product instructions. At the rakes, stop the underlayment at the deck edge first.
- Install the rake drip edge on top of the underlayment. Use the same lap and the same fastener spacing. The rake pieces should lap over the eave metal at the corner so water from the rake falls onto the eave metal, not behind it.
- Shingle or finish the roof so the starter and the field courses cover the flat leg and the fasteners. The kick-out stays visible. It should clear the gutter so water falls into the trough, not behind it.
A reroof adds one step at the front. The old edge metal usually comes off with the shingles. Reusing bent, rusted, or short metal is how the new roof inherits the old leak. If the fascia or the gutter apron is damaged, that repair belongs in the same scope. Leaving it for later means a second trip to the edge after the new shingles are down.
Low-slope systems do not follow this shingle order. On TPO or modified bitumen, the edge metal is specified with the membrane. The sheet welds or adheres to a coated metal flange, and the fastener pattern comes from the manufacturer, not from the shingle code section. Mixing a residential drip-edge detail into a commercial membrane spec is a common way to void the sheet warranty. Ask which detail the system requires before anyone orders metal.
Eave metal, rake metal, and commercial edge details
The same roof can need more than one edge detail. Use this as a planning table, not a price sheet. One Real does not publish project prices, and the right piece depends on the system already on the building.
| Edge. | Where it sits. | Order with the underlayment. | What to confirm. |
|---|---|---|---|
| Eave drip edge. | Lower horizontal edge, above the fascia and gutter. | Metal first, then underlayment over the metal. | Kick-out clears the fascia and lands in the gutter. |
| Rake drip edge. | Sloped gable edge. | Underlayment first, then metal over it. | Rake metal laps over the eave metal at the corner. |
| Gutter apron. | Behind the gutter, at the fascia. | Works with the eave metal. It does not replace a code drip edge. | Water cannot run behind the gutter. |
| Membrane edge metal. | Perimeter of a TPO or modified bitumen roof. | Set by the membrane manufacturer. | Flange, weld, and fastener pattern match the system spec. |
Commercial buildings in our work are often a mix. A sloped shingle or metal section can sit next to a low-slope TPO or modified bitumen deck. Each edge still has to dump water into a gutter, a scupper, or a downspout that the building can actually maintain. A drip edge that kicks water onto a flat roof, or behind a parapet, only moves the leak.
If the project is a full new build or a reroof, the edge detail belongs in the same conversation as drainage, access, and the roof system. For the installation sequence of the whole roof, see the commercial roof installation guide. This article does not choose the system for you.
What goes wrong when the edge is out of order
Most edge leaks we get asked about come from order and fit, not from a missing product name. The metal was often the right type and still put on in the wrong sequence.
- Underlayment under the eave metal. Water on the felt runs behind the metal and down the fascia.
- Rake metal under the underlayment. Sideways rain reaches the bare deck along the gable.
- Laps that face uphill, or laps shorter than 2 inches. The joint becomes a small gutter.
- Fasteners farther than 12 inches apart, or face-nailed through the exposed leg. The metal lifts in wind, and the nail hole stays open.
- A kick-out that stops above the gutter, or that sits inside the gutter trough. Water either overshoots the gutter or runs behind it onto the fascia.
- New shingles over old, short, or rusted edge metal. The new roof looks finished and still wets the wood.
- A shingle drip edge used as the termination on a TPO or modified bitumen roof. The membrane has nothing proper to weld to, and the edge relies on sealant.
Sealant is the usual patch offered for all of these edge mistakes. It hides the joint for a season, until a Texas summer bakes the bead and it splits. A hemmed metal lap, pointed the right way, does not need a bead of caulk to shed water. Caulk spread over a backward lap will not change the direction the water wants to run.
If the inside of the building already shows a stain near an exterior wall, do not assume the drip edge is the source. Water can travel along a deck, a wall flashing, or a valley and show up far from the entry. Our notes on commercial roof repair signs walk through what is worth writing down before anyone opens the roof. A free roof inspection is the right next step when the edge is stained, the fascia is soft, or the gutter stays wet behind the metal after a storm.
Questions to settle before the metal is ordered
Edge metal is cheap compared with a callback at the fascia. It is also one of the first things covered up. These are the questions worth answering while the scope is still open.
Which code edition applies, and does the city amend the drip-edge section? The published IRC minimums above are a floor for shingle roofs. A local amendment, a manufacturer spec, or a designer detail can ask for a wider flange, a different metal, or a closer fastener spacing. Get that in writing before the material is on the roof.
Is this a shingle edge or a membrane edge? Asphalt shingles follow the eave-then-rake order above. Metal roofs often use their own eave and rake trim, matched to the panel. TPO and modified bitumen use system edge metal. One Real installs all four. The detail has to match the system going down, not the detail from the last roof on the building.
What is under the edge right now? On a reroof, soft fascia, a failed gutter apron, or wet sheathing changes the scope. Covering that wood with new metal does not dry it out. Say so in the scope if the fascia or the first course of deck needs to be replaced.
Where does the water go after it leaves the metal? A kick-out into a clogged gutter, a undersized downspout, or a scupper that ponds will send water back to the edge you just closed. Gutters are a separate scope from the drip edge, and they should be looked at in the same visit.
Who is on site while the edge is open? Commercial work often has tenants, deliveries, and doors that cannot close for a full day. The edge is exposed between tear-off and dry-in. That window should be planned around the building, not left to the end of the day. For a property with more than a roof in scope, start with commercial roofing and the project conditions, not with a metal order.
Talk through roof system planning
Frequently asked questions
Does every roof need drip edge?
On an asphalt shingle roof, the International Residential Code requires drip edge at the eaves and the rakes. Low-slope commercial roofs still need a finished edge, but the piece is usually the membrane system's edge metal, gravel stop, or fascia detail rather than a shingle drip edge. The local code and the roof system decide which one.
Should underlayment go over or under the drip edge?
Over the drip edge at the eaves, and under the drip edge at the rakes. That is the order in IRC R905.2.8.5. Reversing it at either edge gives water a path onto the fascia or the bare deck.
Can new shingles go over the old drip edge?
Only if the old metal is the right width, still fastened, not rusted through, and still kicks water clear of the fascia. Most reroofs remove it. Short or bent metal from an older roof will not meet the 2-inch deck leg or the quarter-inch kick-out, and the new shingles will hide that.
Is drip edge the same as gutter apron?
No. Drip edge sits on the deck and kicks water off the roof. A gutter apron is the metal behind the gutter at the fascia. Some roofs need both. One does not satisfy the code requirement for the other.
Who installs drip edge on a One Real project?
One Real Roofer and Construction manages the roof installation, including the edge details, for residential work in Texas and commercial work in Texas, Oklahoma, Arkansas, and Louisiana. The sales conversation sets the scope. The company runs the construction. Call (817) 677-6822 if you want the edge looked at before a reroof.